
Elmore County has started phase 1 of a 2 phase project. On Coosada Pkwy, the County has a milling contractor removing the 1” wearing surface with the County retaining 100% of the millings. The County plans to utilize the millings by basing dirt roads and repairing shoulder drop offs on the County’s 1,000 mile roadway system. Phase 2 will consist of a paving contractor placing an 1.5” wearing surface and new thermoplastic traffic stripe in the upcoming weeks.
Contractor Milling the Old Surface Millings Stockpile
25
SEP
2019
SEP
2019
About the Author: